Construction time: 202101
Project Content: Student dormitory (newly built three floors)
Student canteen (newly built two floors)
Building area:New construction area 3210㎡
The modular construction method is applied to school buildings, which is not only green and environmentally friendly, but also saves construction time.
#ModularSchool #PrefabBuilding #ModularHouse #FlatPackContainer