proList_5
case-1

Shenzhen Luohu District School

Shenzhen Luohu District School

Project  Description Construction Time 2020 Project location Shenzhen, China Number of modules 48 Area of structure 7013㎡ The construction time is about 70 days, and 1600 degrees can be provided

case-1

Taining Primary School in Shenzhen

Taining Primary School in Shenzhen

Project  Description The facade design of the building adopts the standardization of modular prefabricated aluminum panel curtain wall, which gives the building a full sense of technology and the future. Due to the rainy weather in Shenzhen, the corridor was designed to be widened to 3.5 meters, transforming the originally pure passage space into a communication space. Construction Time 2021 Proj...

case-1

Teaching Building of Beijing Normal University Kindergarten Mingguang Branch

Teaching Building of Beijing Normal University ...

Project  Description After reconstruction, the project has a total construction area of 5,400 square meters and a newly built area of 2,400 square meters, meeting the preschool education needs of preschool children in 18 classes (540 people). The construction content includes teaching buildings, kitchens, guard rooms, boiler rooms, etc., and outdoor projects including activity venues, roads and squa...

case-1

Modular classroom of Capital Normal University High School

Modular classroom of Capital Normal University ...

Project  Description Construction Time 201908-11 Project location Beijing, China Number of modules 132 Area of structure 4397.55㎡

case-1

Modular Teaching Building of Beijing Bayi High School

Modular Teaching Building of Beijing Bayi High ...

Project  Description ● The teaching building of the project adopts a modular construction form, which can greatly improve the classroom supply capacity in the short term. ● It not only ensures the quality of the project, but also transfers 90% of the construction process to the factory through the use of sophisticated equipment and standardized construction procedures to prefabricate , minimizing di...

case-2

Music Rehearsal Hall of Affiliated Primary School to Renmin University of China

Music Rehearsal Hall of Affiliated Primary Scho...

Project  Description The project is composed of 39 super-large modules with a span of 15 meters. The building height is 8.8 meters and the second floor is as high as 5.3 meters. It has achieved a breakthrough in the field of modular construction in the field of education and large space. Construction Time 201706 Project location Beijing, China Number of modules 39 Area of structure 1170㎡ ...