proList_5

Taining Primary School in Shenzhen

case-6

Project  Description

The facade design of the building adopts the standardization of modular prefabricated aluminum panel curtain wall, which gives the building a full sense of technology and the future. Due to the rainy weather in Shenzhen, the corridor was designed to be widened to 3.5 meters, transforming the originally pure passage space into a communication space.

Construction Time 2021 Project location Shenzhen, China
Number of modules 141 Area of structure 6646㎡
case-2
case-5
case-3
case-4