Project Description
The project covers an area of about 3,481 square meters, with a construction area of about 2,328 square meters. The parking lot is about 15 meters high and 370 additional parking spaces are installed. The project is under construction, and the construction period is 180 days.
Compared with the traditional technology, it adopts the national leading level mechanical parking equipment technology, and has the remarkable characteristics of high safety performance, low operation and maintenance cost, and convenient use.